SFr. 63.00
€ 68.04
BTC 0.0011
LTC 0.994
ETH 0.0207


bestellen

Artikel-Nr. 34260532


Diesen Artikel in meine
Wunschliste
Diesen Artikel
weiterempfehlen
Diesen Preis
beobachten

Weitersagen:



Autor(en): 
  • Zenawi Limenih
  • Usefulness of Adopting the last Planner System in the Construction Process of Addis Ababa Road Projects 
     

    (Buch)
    Dieser Artikel gilt, aufgrund seiner Grösse, beim Versand als 2 Artikel!


    Übersicht

    Auf mobile öffnen
     
    Lieferstatus:   i.d.R. innert 7-14 Tagen versandfertig
    Veröffentlichung:  Juli 2022  
    Genre:  Naturwissensch., Medizin, Technik 
    ISBN:  9783346614247 
    EAN-Code: 
    9783346614247 
    Verlag:  Grin Verlag 
    Einband:  Kartoniert  
    Sprache:  English  
    Dimensionen:  H 210 mm / B 148 mm / D 11 mm 
    Gewicht:  213 gr 
    Seiten:  140 
    Zus. Info:  Paperback 
    Bewertung: Titel bewerten / Meinung schreiben
    Inhalt:
    Master's Thesis from the year 2022 in the subject Engineering - Civil Engineering, grade: 3.56, University of Gondar (Institute of Technology), language: English, abstract: Modern construction is characterized by its efficient utilization of construction resources to accomplish numerous construction activities without waste. But, Addis Ababäs Road construction projects fail to be executed on time, within the allocated budget, and with the desired quality. To solve this problem, a new management concept is introduced, namely lean construction. It is known to increase productivity and minimize waste. To realize this solution, last planner system (LPS) is used; it is one tool of lean construction. It is a person or group of people with the task to control the production unit. The main objective of this study is to assess usefulness of the last planner system implementation to advance the current construction process management in Addis Ababa city road projects. The research was conducted on selected asphalt road construction projects located in Addis Ababa city. To address the problems Questioners, observations, interviews, focus group discussion, and recently published journals were employed as a qualitative and quantitative data collection tools and analyzed using statistical package for the social science version 26 and super decision model version 3.2. The finding shows that; the construction management process adopted in all three sites is more or less similar they use a push planning system and critical path method to determine the duration following the master schedule but have no weekly work plan and lookahead schedule to forecast the coming week's duty. The LPS implementation expected barriers are also ranked from one to five: as Labor-related, internal working environment-related, stakeholders-related, exogenous related, and material related expected barriers respectively. The last planner system has many benefits as agreed by different scholar¿s those are time-related, Cost-related, claim-related, and quality-related benefits are the main benefits obtained through the LPS implementation and it is possible to conclude; LPS is useful for the road construction management system. The research is significant in creating awareness & understanding on the adoption of the lean construction tool (LPS) in sustainable construction, to improve knowledge and understanding of the implementation of LPS. Moreover, the LPS implementation conceptual framework was also developed based on the last planner system principles.

      



    Wird aktuell angeschaut...
     

    Zurück zur letzten Ansicht


    AGB | Datenschutzerklärung | Mein Konto | Impressum | Partnerprogramm
    Newsletter | 1Advd.ch RSS News-Feed Newsfeed | 1Advd.ch Facebook-Page Facebook | 1Advd.ch Twitter-Page Twitter
    Forbidden Planet AG © 1999-2024
    Alle Angaben ohne Gewähr
     
    SUCHEN

     
     Kategorien
    Im Sortiment stöbern
    Genres
    Hörbücher
    Aktionen
     Infos
    Mein Konto
    Warenkorb
    Meine Wunschliste
     Kundenservice
    Recherchedienst
    Fragen / AGB / Kontakt
    Partnerprogramm
    Impressum
    © by Forbidden Planet AG 1999-2024