SFr. 238.00
€ 257.04


bestellen

Artikel-Nr. 14756610


Diesen Artikel in meine
Wunschliste
Diesen Artikel
weiterempfehlen
Diesen Preis
beobachten

Weitersagen:


Herausgeber: 
  • Jan Weglarz
  • Project Scheduling: Recent Models, Algorithms and Applications 
     

    (Buch)
    Dieser Artikel gilt, aufgrund seiner Grösse, beim Versand als 3 Artikel!


    Übersicht

    Auf mobile öffnen
     
    Lieferstatus:   i.d.R. innert 5-10 Tagen versandfertig
    Veröffentlichung:  November 2012  
    Genre:  Wirtschaft / Recht 
     
    Algorithms / Calculus / Management / Management spezifischer Bereiche / Modeling / Negotiations / Optimierung / Projectmanagement
    ISBN:  9781461375296 
    EAN-Code: 
    9781461375296 
    Verlag:  Springer 
    Einband:  Kartoniert  
    Sprache:  English  
    Dimensionen:  H 235 mm / B 155 mm / D 30 mm 
    Gewicht:  820 gr 
    Seiten:  548 
    Bewertung: Titel bewerten / Meinung schreiben
    Inhalt:
    The problem of allocating scarce resources over time to perform a given set of activities - that is, project scheduling - appears in the vast spectrum of real-world situations. Over the last forty years project scheduling problems have been carefully studied, resulting in a considerable body of knowledge. Recently, however, the power and ubiquity of the computer has had a pronounced effect on research in project scheduling and project scheduling models. As a result, considerable progress has been made in all directions of modeling and finding solutions to these problems. This volume is a state-of-the-art treatment of Project Scheduling in general and of recent developments in particular. Part I deals with classical models. By `classical model' we mean the deterministic problems involving discrete resources only and the evaluation of schedules on the basis of a single criterion. This term covers a wide variety of problems, including (discrete) resource-duration interaction, i.e. multi-mode models. Part 2 deals with heuristic algorithms for these models. It is complemented by chapters treating such important problems as benchmark instances, interval capacity consistency tests, and the evolution of software quality for (classical) project scheduling problems. In Part 3 the most important new or `non-classical' models are considered. These include probabilistic and fuzzy models, and continuous resources as well as multi-criteria formulations and knowledge-based systems. Part 4 contains some important extensions and/or applications of the project scheduling problems considered in the previous chapters.

      



    Wird aktuell angeschaut...
     

    Zurück zur letzten Ansicht


    AGB | Datenschutzerklärung | Mein Konto | Impressum | Partnerprogramm
    Newsletter | 1Advd.ch RSS News-Feed Newsfeed | 1Advd.ch Facebook-Page Facebook | 1Advd.ch Twitter-Page Twitter
    Forbidden Planet AG © 1999-2026
    Alle Angaben ohne Gewähr
     
    SUCHEN

     
     Kategorien
    Im Sortiment stöbern
    Genres
    Hörbücher
    Aktionen
     Infos
    Mein Konto
    Warenkorb
    Meine Wunschliste
     Kundenservice
    Recherchedienst
    Fragen / AGB / Kontakt
    Partnerprogramm
    Impressum
    © by Forbidden Planet AG 1999-2026