SFr. 36.50
€ 39.42


bestellen

Artikel-Nr. 40198160


Diesen Artikel in meine
Wunschliste
Diesen Artikel
weiterempfehlen
Diesen Preis
beobachten

Weitersagen:



Autor(en): 
  • Class
  • Beyond Risk Mitigation: Integrating Value Management for Successful Construction Projects 
     

    (Buch)
    Dieser Artikel gilt, aufgrund seiner Grösse, beim Versand als 2 Artikel!


    Übersicht

    Auf mobile öffnen
     
    Lieferstatus:   i.d.R. innert 7-14 Tagen versandfertig
    Veröffentlichung:  Mai 2024  
    Genre:  Naturwissensch., Medizin, Technik 
     
    Bauhandwerk / Construction Cost Management / Construction Project Success / Design for constructability / Earned Value Management (EVM) / Hochbau und Baustoffe / Proactive Project Management / Project Delivery Optimization
    ISBN:  9783384241337 
    EAN-Code: 
    9783384241337 
    Verlag:  tredition 
    Einband:  Kartoniert  
    Sprache:  English  
    Dimensionen:  H 234 mm / B 155 mm / D 10 mm 
    Gewicht:  236 gr 
    Seiten:  132 
    Bewertung: Titel bewerten / Meinung schreiben
    Inhalt:
    Value management is described as a method used in the construction design process to identify or establish the value system of the client and it also serves to ensure that the client values are communicated and understood by the project team (Green, 1991). Value Management (VM) evolved from Value Engineering (VE), which places significant emphasis on optimising the function of an asset in terms of lowest cost while the VM methodology consists of a number of steps which examine the functional requirements of the client through a process of analysis and then synthesises a suitable design that offers the best value and meets the functional requirements of the client (Thiry, 1997; PMI, 2015). This study endeavored to provide a clear distinction between VE and VM because these terms are mostly applied by different scholars interchangeably. It is for this purpose that the researcher further emphasised that only VM was adopted for use in this study. It is also asserted that Value Management is different from value Engineering in that VM is aimed at the optimisation of solutions in the establishment of suitable decision frameworks for the rest of the project which is achieved through the use of a structured decision model that originates in Multi-Attribute Utility Theory (Green, 1994). A project is a once-off activity, with one chance to achieve a satisfactory outcome and this necessitates the establishment of unambiguous objectives. Value Management identifies the option which gives the best value for money in accordance with the set criteria (Hiley and Paliokostas, 2001).

      



    Wird aktuell angeschaut...
     

    Zurück zur letzten Ansicht


    AGB | Datenschutzerklärung | Mein Konto | Impressum | Partnerprogramm
    Newsletter | 1Advd.ch RSS News-Feed Newsfeed | 1Advd.ch Facebook-Page Facebook | 1Advd.ch Twitter-Page Twitter
    Forbidden Planet AG © 1999-2026
    Alle Angaben ohne Gewähr
     
    SUCHEN

     
     Kategorien
    Im Sortiment stöbern
    Genres
    Hörbücher
    Aktionen
     Infos
    Mein Konto
    Warenkorb
    Meine Wunschliste
     Kundenservice
    Recherchedienst
    Fragen / AGB / Kontakt
    Partnerprogramm
    Impressum
    © by Forbidden Planet AG 1999-2026