SFr. 15.90
€ 17.17
BTC 0.0003
LTC 0.241
ETH 0.006


bestellen

Artikel-Nr. 36388356


Diesen Artikel in meine
Wunschliste
Diesen Artikel
weiterempfehlen
Diesen Preis
beobachten

Weitersagen:



Autor(en): 
  • Silvestre Cassa Iombo
  • A Guide to DEVELOPMENT OF AN OIL FIELD 
     

    (Buch)
    Dieser Artikel gilt, aufgrund seiner Grösse, beim Versand als 2 Artikel!


    Übersicht

    Auf mobile öffnen
     
    Lieferstatus:   i.d.R. innert 7-14 Tagen versandfertig
    Veröffentlichung:  Juni 2022  
    Genre:  Naturwissensch., Medizin, Technik 
    ISBN:  9798885365291 
    EAN-Code: 
    9798885365291 
    Verlag:  Writers Republic LLC 
    Einband:  Kartoniert  
    Sprache:  English  
    Dimensionen:  H 229 mm / B 152 mm / D 5 mm 
    Gewicht:  131 gr 
    Seiten:  80 
    Zus. Info:  Paperback 
    Bewertung: Titel bewerten / Meinung schreiben
    Inhalt:
    Silvestre Cassa Iombo started working in the Oil Industry in 2001, after completing his training in Petroleum Engineering on December 21, 2001. In 2002, he joined SONANGOL as a trainee production engineer in the SONANGOL Production Department. As a trainee production engineer he developed a production control spreadsheet for the Girassol field. During his time at Total, he learned how to monitor well performance, equipment installation procedures, and project schedule control. After completion of internship, internship in Block 17, wrote an article about Block 17 Operations and challenges of Project Dália. In July 2003, he benefited from a petroleum process course and joined the TOTAL studies department to carry out gas field studies in Qatar using PROII and OLGA2000 software. Upon completion of the studies he wrote a technical document entitled "High Pressure Studies". He also carried out studies on the Dalia project using SHG software to perform calculations for lift gas injection. In 2004, he worked on the Rosa project as a Project Engineer whose scope was to coordinate the work between the Engineering and Operations project team. During the Service mission in Paris, he started to develop Subsea and Surface Software. Upon completion of service mission, wrote the technical report to describe the challenges of the Dalia project. In 2006, he was promoted to Project Coordinator Clov and Block 32 in the Installation Department. In 2007, he benefited from a petroleum technology training at GE oil & gas. After completing the training, he wrote a document entitled Evolution of FPSO in the World and made a presentation at SONANGOL. In 2008-2009, he was appointed as coordinator of all SONANGOL P & P projects in the Facilities Department. In 2009-2010, he joined the Kizomba Satellite Project Team as a project engineer. It created a tool to control the project completion system, it was the first time it was used for the Kizomba satellite project. He completed the oil company integrated system control software. In 2011-2014, started coordinating the team from Block 18 for the Facilities Department. In 2015-2017, she coordinated the Block 16 team at the level of the SONANGOL Production Department and Joint Development of Blocks 16 & 31. During this period, she wrote an article titled by Platinum Project Development Concept.

      



    Wird aktuell angeschaut...
     

    Zurück zur letzten Ansicht


    AGB | Datenschutzerklärung | Mein Konto | Impressum | Partnerprogramm
    Newsletter | 1Advd.ch RSS News-Feed Newsfeed | 1Advd.ch Facebook-Page Facebook | 1Advd.ch Twitter-Page Twitter
    Forbidden Planet AG © 1999-2024
    Alle Angaben ohne Gewähr
     
    SUCHEN

     
     Kategorien
    Im Sortiment stöbern
    Genres
    Hörbücher
    Aktionen
     Infos
    Mein Konto
    Warenkorb
    Meine Wunschliste
     Kundenservice
    Recherchedienst
    Fragen / AGB / Kontakt
    Partnerprogramm
    Impressum
    © by Forbidden Planet AG 1999-2024
    Jetzt auch mit LiteCoin bestellen!