SFr. 77.00
€ 83.16
BTC 0.0014
LTC 1.347
ETH 0.0268


bestellen

Artikel-Nr. 11154528


Diesen Artikel in meine
Wunschliste
Diesen Artikel
weiterempfehlen
Diesen Preis
beobachten

Weitersagen:



Autor(en): 
  • Marco Ramoni
  • On the feasibility of TBM drives in squeezing ground and the risk of shiel jamming 
     

    (Buch)
    Dieser Artikel gilt, aufgrund seiner Grösse, beim Versand als 3 Artikel!


    Übersicht

    Auf mobile öffnen
     
    Lieferstatus:   Auf Bestellung (Lieferzeit unbekannt)
    Genre:  Naturwissensch., Medizin, Technik 
     
    TBM / Tunnel, Tunnelbau / Tunnelbau
    ISBN:  9783728133632 
    EAN-Code: 
    9783728133632 
    Verlag:  Vdf Hochschulverlag 
    Einband:  Kartoniert  
    Sprache:  English  
    Serie:  #236 - Veröffentlichungen des Instituts für Geotechnik (IGT) der ETH Zürich  
    Dimensionen:  H 297 mm / B 210 mm / D  
    Gewicht:  700 gr 
    Seiten:  216 
    Illustration:  zahlr. Tabellen und Grafiken 
    Zus. Info:  KART 
    Bewertung: Titel bewerten / Meinung schreiben
    Inhalt:
    Squeezing ground represents a challenging operating environment as it may slow down or obstruct TBM operation. Due to the geometrical constraints of the equipment, relatively small convergences of 10-20 cm may lead to considerable difficulties in the machine area (sticking of the cutter head, jamming of the shield) or in the back-up area (e.g., jamming of the back-up equipment, inadmissible convergences of the bored profile, damage to the tunnel support). Depending on the number and the length of the critical stretches, squeezing conditions may even call into question the feasibility of a TBM drive. On account of this, and bearing in mind the steady increase in the number of tunnels excavated with TBMs through so-called "difficult ground conditions", the topic investigated in this PhD thesis is of great practical relevance. Based upon case histories reported in the literature, Part I sets out firstly to give an overview of the specific problems of TBM tunnelling under squeezing conditions. Part II presents a computational model which simulates accurately and efficiently the advancing TBM and the installed tunnel support in one single computational step applying the so-called "steady state method". Part III advances a number of theory-based decision aids, which will support rapid, initial assessments to be made of thrust force requirements. Part IV investigates the complex problem of the interaction between the advancing TBM, the consolidating ground and the lining. Emphasis is thereby placed on the effect of the gross advance rate and the effect of ground permeability on shield loading during regular TBM operation (the boring process including short standstills) and during a long standstill.
      



    Wird aktuell angeschaut...
     

    Zurück zur letzten Ansicht


    AGB | Datenschutzerklärung | Mein Konto | Impressum | Partnerprogramm
    Newsletter | 1Advd.ch RSS News-Feed Newsfeed | 1Advd.ch Facebook-Page Facebook | 1Advd.ch Twitter-Page Twitter
    Forbidden Planet AG © 1999-2024
    Alle Angaben ohne Gewähr
     
    SUCHEN

     
     Kategorien
    Im Sortiment stöbern
    Genres
    Hörbücher
    Aktionen
     Infos
    Mein Konto
    Warenkorb
    Meine Wunschliste
     Kundenservice
    Recherchedienst
    Fragen / AGB / Kontakt
    Partnerprogramm
    Impressum
    © by Forbidden Planet AG 1999-2024
    Jetzt auch mit LiteCoin bestellen!